There is no prior knowledge that is needed; however, basic understanding of how to view working calendars and mathematics calculations is benefitial

Aprox. 21 horas para completar
Inglés (English)

Qué aprenderás

  • The key project scheduling techniques and procedures 

  • How to develop and manage a schedule and understand scheduling tools such as bar charts, activity on arrow, and activity on nodes

  • The multiple relationships that connect all the construction activities from start to finish

  • The importance of the critical path in a project network and project activities float

Habilidades que obtendrás

  • Schedule
  • Linear Scheduling Method
  • Program Evaluation And Review Technique (PERT)
  • Critical Path Method
Fechas límite flexibles
Restablece las fechas límite en función de tus horarios.
Certificado para compartir
Obtén un certificado al finalizar
100 % en línea
Comienza de inmediato y aprende a tu propio ritmo.
Laboratorios de Coursera
Nivel principiante

There is no prior knowledge that is needed; however, basic understanding of how to view working calendars and mathematics calculations is benefitial

Aprox. 21 horas para completar
Inglés (English)

Ofrecido por

Placeholder

Universidad de Columbia

Programa - Qué aprenderás en este curso

Calificación del contenidoThumbs Up92%(5,949 calificaciones)
Semana1
Semana 1
1 hora para completar

Introduction to Construction Scheduling

1 hora para completar
1 video (Total 10 minutos), 2 lecturas
1 hora para completar

Bar (Gantt) Charts

1 hora para completar
3 videos (Total 28 minutos)
1 hora para completar

Activity Precedence Diagrams

1 hora para completar
3 videos (Total 31 minutos)
1 hora para completar

Types of Construction Activity Relationships

1 hora para completar
5 videos (Total 29 minutos)
2 horas para completar

Forward and Backward Pass Calculations

2 horas para completar
4 videos (Total 44 minutos)
Semana2
Semana 2
1 hora para completar

Critical Path

1 hora para completar
6 videos (Total 45 minutos)
1 hora para completar

Activity Floats

1 hora para completar
5 videos (Total 45 minutos)
1 hora para completar

Understanding Work Dates and Calendar Dates

1 hora para completar
3 videos (Total 26 minutos)
Semana3
Semana 3
2 horas para completar

Activity on Arrow

2 horas para completar
8 videos (Total 72 minutos)
1 hora para completar

Program Evaluation & Review Technique (PERT) and Range Estimating

1 hora para completar
6 videos (Total 73 minutos)
1 hora para completar

The Role of the Scheduler in Construction Management

1 hora para completar
3 videos (Total 22 minutos)
Semana4
Semana 4
2 horas para completar

Linear Construction Operations and Line of Balance

2 horas para completar
5 videos (Total 59 minutos)
3 horas para completar

Technology Applications for Scheduling

3 horas para completar
12 videos (Total 138 minutos)

Reseñas

Principales reseñas sobre CONSTRUCTION SCHEDULING

Ver todas las reseñas

Acerca de Programa especializado: Gestión de obras

Gestión de obras

Preguntas Frecuentes

¿Tienes más preguntas? Visita el Centro de Ayuda al Estudiante.